SCRAPPING.

Hutchison Ports TNG recently performed the scrapping of 2 tanker vessels of 45, 000 TPM each, NEW PEMEX I and NEW PEMEX IV, built at the shipyard in 1987 and 1989.

The scrapping service involves a scrapping program designed by our engineers, where they cut blocks of up to 60 tons weight, through precise analysis and calculations that allow 2 cranes of 100 tons capacity for their unloading, in order to assure the integrity of the vessel while being afloat.

  • Scrapping or dismantling of vessels of up to 200m long and 30 m high.
  • We have qualified manpower to perform boilermaking works.
  • Maneuvering and crane operating staff, experts in hoisting
  • Management and disposal of residues according to environmental laws.