Crankshaft replacement

Bulk ship crankshaft replacement, 190m in length, 32m in beam and 18m in depth.

The Singapore flag project, attended to afloat at the shipyard’s repair dock, included the extraordinary lifting maneuver of a 120-ton monoblock, 45-tonne damaged crankshaft extraction, for which a travel rail was expressly manufactured.

Likewise, the installation of the new crankshaft was made and finally the placement in the original position of the monoblock.