Hutchison Ports TNG fabricates and installs a clarifying tank in Coatzacoalcos.
Construction of a clarifier tank of 26 meters in diameter and 8 meters in height. The project comprised the prefabrication and on-site installation of scallops to form the wavy conical bottom of the tank, 24 support beams and 4 steel rings that integrate the wall of the tank, by the TNG team in the city of Coatzacoalcos, Veracruz.
The project was carried out with approximately 170 tons of steel plate and profiles.