Hutchison Ports TNG carries out the maintenance of the propulsion system of a platform.
After its last visit in 2012, the semi-submersible platform made a trip of more than 440km to return to TNG.
The platform remained afloat on the east side of the enlistment dock. In this way, technical assistance was provided for the maintenance of its propulsion system. Finally, the dismantling and assembly maneuver of 4 thrusters of the platform, weighing approximately 12 tons, was carried out to Ship D of TNG for maintenance.